Project Details
Project Title: QT Parramatta
Project Address: 8 Phillip Street, Parramatta
Project Account Manager: Chris Hartz
Project Key Facts
Start Date: 2024
End date: Q4 2026
Materials supplied: Econopro binder, Econopro plus, Hylevel C30
Total value of project (to RLA): $200,000.00
Project Brief:
Construction of a multi-storey residential complex with associated dining and shopping facilities. Total site area 15,000m2. Construction of a 60-storey hotel that will have a combination of 265 hotel suites and 367 residential apartments, multiple eateries along with gym, pool, and sauna. From ground to level 17 will be the 5-star hotel and remaining floors will be residential apartments. Total area size: 2307m2.
The Challenge:
As the contractor is only using our Econopro materials via pump truck, the main challenges that we are currently facing will be making sure we have enough notice so we can have enough stock to send to site and to organise freight.
The Solution:
Keep in regular contact with both the contractor and with Hychem to check their current stock levels. If levels are low, retrieve a new PO to place a new order in time so the build stays on time. Once we have the PO, we need to arrange suitable days and times for delivery due to site delivery restrictions.
Customer Benefits – Key Points:
I have visited this site once so far while the contractor was pumping our material. He mentioned that the material pumps great from the truck and flows beautifully. The delivery of the stock can be a bit difficult at times, but that is due to the builder’s restrictions. Overall, he is very happy with our product and the support he gets from us.
Builder / Contractor Feedback:
The contractor reported that the materials pump great from the truck and flow beautifully, providing high satisfaction with both product performance and ongoing technical support despite delivery restrictions on-site.
Substrate Preparation:
Standard surface preparation and priming ahead of pumping Econopro materials.